Thursday, March 15, 2007

Building a layout - shelves

My new layout is an around-the-walls style layout, with a peninsula coming from one end of the room. I decided to build the layout on shelf brackets screwed into the wall studs, with shelves cut from 4x8 foot sheets of plywood. This way, I would not have legs under the layout, leaving room for storage of my model railroad equipment and railroad ephemera.

I started by deciding what height to make the layout. As I mentioned before, the whole layout is on one level. Most people say you should build it somewhere between belt height and shoulder height. I chose a height of about 44" from the carpet to the top of the plywood. I wanted it a little on the low side so kids would have a chance of seeing what's on the layout with a little stool.


After borrowing a friend's stud finder, I set about marking where the studs were on the walls with a pencil. I used a laser level on my tripod to make sure I was building the layout perfectly level.

Maybe I was geeking out a bit too much. Maybe I just wanted to use my Christmas present. :)

I screwed the supports into the wall at each end of the plywood sheet, then screwed the supports into the sheet from below to ensure no screw heads would be on the top. I then filled in the supports between the ends and screwed them into the board too. The result was a very very firm layout with no wobble. I'm pretty sure I could stand on it, but I haven't tried. :)

In the corners where I couldn't get supports in, I used little metal connectors to screw the two boards together and prop up pieces of plywood I cut to fill the corners. I reasoned there wouldn't be much weight there so they didn't have to be as strong as the rest of the layout.

For the end with the peninsula, I built a traditional box structure and put legs on it. The peninsula is going to be on legs and I figured it would need a firm, rigid structure to attach to.


I haven't built the peninsula yet, since my layout room is doubling as a spare bedroom for a few more weeks. Soon, soon!

So far I'm very happy with the method I used to build the layout. It has made tracklaying a breeze and I appreciate the rigidity of the structure. The NSER was built on legs, and wasn't attached to the walls, so it was a little wobbly until the whole thing was built. This layout is rock solid.

Labels: , ,

Tuesday, March 13, 2007

Latest layout plan


Finally we come to the plan I am building to, version 5.

This version features four long tracks of staging each for Miramichi and Campbellton, as well as a single track of staging for each of the Caraquet Subdivision, the Nepisiguit Subdivision, the Irvco spur in Belledune, and the Smurfit-Stone industry in Bathurst. Can you ever have enough staging?

I wanted to model the Smurfit-Stone facility because they had their own switcher, caboose and plow. I thought that would be a nice feature to show them come up to interchange with CN at the junction, just like the prototype did.

There are no provisions for grades in this, which may make it boring from a scenic perspective. Obviously my layout is skewed toward operation, given the number of interchanges and online industries.

I would appreciate any comments, good or bad! :)

Labels: ,

Monday, March 12, 2007

Track Planning For The New Layout

With my new layout room, I needed a new plan. My initial thought was to continue with the Dartmouth Subdivision idea that the NSER used.

This plan is basically a single-level dogbone with some around-the-wall staging. No doubt you can see a number of problems with the design, including restricted aisle space. On the plus side, I would have had a wye for turning and fairly good switching opportunities.



I decided I wanted to try something fresh. Based on my own railfanning experiences, I settled on a layout loosely based around the Bathurst area in the early 1980s before CN started ripping up the old subdivisions. The layout would go from "Moncton / Miramichi" (staging) through Nepisiguit Junction, Bathurst, and Belledune before "Campbellton" (staging). It would feature run-through trains that just went from one staging yard to another, switching along the way, as well as VIA's Ocean and local passenger service.

This is a very rough around-the-walls plan just to get an idea of where the stations would fit. I kept the around-the-wall staging and obviously designed for continuous running. Time to flesh it out.



It's almost the same plan, with more detail. Notice how the staging for both "ends" is in the same place. This is still very rough as the space allocated for switches is not realistic. One must always use real switch dimensions to ensure you don't get impossible angles.

I had this idea that I could get more track into the same space by doing a twice-around layout, spawning this plan.




This time the staging is on both sides of the room. The twice-through idea does give long main line runs but I decided it would not look realistic.

Next time I'll show you the "final" version. It does away with the twice-through idea but looks a lot like this one.

Labels: , ,

Thursday, March 8, 2007

Saint John model railroad show pictures


I put some photos I took at last Saturday's model train show in Saint John in my photo gallery.

As usual the Saint John Society of Model Railroaders did a fine job organizing the event. The usual displays were there, with the SJSMRR modular display front and center.

For the four and under crowd, my daughter liked the O scale displays on the left of the venue as well as Hazen Middleton's Thomas train and the Bugs Bunny/Daffy Duck speeder.

I enjoyed the chance to talk with some old friends, like Bill Linley, Ron Grant, Art Clowes and Tim Dryden.

I didn't buy much - two covered hoppers for $5 each and a little toy engine for a quarter.

Good show!

Labels: , , , ,

Thursday, March 1, 2007

Room Preparation

I tore the Nova Scotia Eastern Railway up in the summer of 2004 to get ready for our move to a larger house. Being a good railway baron, I ensured I would have (more) space for a new layout in the new home. I ended up with a 10x16 foot room, which is about double the area of the NSER.

Empty roomThe first trick was to get the room ready. It had four walls, if you could call them that. Two of the walls were the concrete foundation, and the other two were framed but had no electrical work done. There was one heater in the room and one single-bulb light fixture. The floor was concrete and there was no ceiling. Clearly a lot of work needed to be done!

Empty roomMy father-in-law and I put the framing, insulation and wallboard/gyproc up. The ceiling is gyproc as well. I painted the entire room light blue, including the ceiling. I had a flooring dealer come in to install dark grey carpeting with an underpad, for comfort.

We put in six electrical outlets, two each on the long walls and one centered on each of the short walls. I wanted to have plenty of light, so we put in four two-tube flourescent fixtures on one switch plus provision for a track light on a dimmer. The baseboard heater remains on one of the walls, controlled by a thermostat in the room. There is no telephone connection in the room yet, but I plan on installing one as well as a network port for a future computer.

Finished roomI think the finished product looks pretty good. I'm glad I decided to go with the four light fixtures. It may seem like overkill but I like being able to work without having shadows in the way. I think it will work well when it comes time to take "railfan" photographs. I still haven't put the track lighting in, but that will come in time.

Finished roomI should mention the two floods we had in the basement. We had a problem with the drain tile around the house, and in the winter of 2005-2006 our basement flooded several times. There were two times in particular where the train room was flooded enough that the carpet became saturated. Both times I had to rip the carpet up and bring in blowers and heat to dry it out, after sucking up whatever water I could with the shop vacuum. Fortunately no model railroad stuff was damaged and the carpet seems to have survived. Even though our flooding problem is fixed, I still don't leave anything on the floor - just in case.

Labels: , , ,